UPS Systems, UPS Battery Replacement, and Emergency Generators
Smart Power has provided UPS computer power systems to the Long Island and New York area for almost 20 yeasrs. New UPS systems, UPS battery replacement, UPS testing for any manufactureers including Liebert, Eaton/Powerware, Best Power, MGE Tripplite and others. Our long term clients include some of the areas largest corporations and hospitals as well as many small firms. Smart Power designed, installed and continues to support an emergency generator and UPS systems at Long Island's largest firms and health care facilities. FAQ
How often should UPS batteries be tested?
UPS Battery testing should be done at least once a yer, more often for critical or no redundant systems. The batteries should be tested with a load tester and be able to maintain output without fading.
How long do UPS batteries last?
UPS Batteries last 3-7 years depending on many conditions, how often they are loaded, storage temperature, (more heat less time). Smart Power replaces a single UPS battery or an entire bank depending on length of service.
How oftern should my emergency generator be tested?
For critical loads such as a data center and health care facilities Smart Power recommends a weekly generator excercise, and a supervised monthly or quaterly test, hospitals should follow established requirements. Generators should be loaded during testing and a full load transfer should be performed to be sure all transfer switches are exercised and functioning properly.
Smart Power is a Powerware Dealer. |